Todd SWMP – Outflow Channel

The project entailed construction of a 330m outflow channel designed to provide a fish habitat.

Highlights Include:

  • Excavation of 35,000m³ of earth
  • Construction of 330m meandering low flow channel within a much wider high flow channel
  • Fish habitat features including riffles of washed river stone, boulder clusters and root wads